Method

How we run a project

A project is won before the first bucket of earth is moved: in the pricing, in the way crews are organised, and in what is handed over at the end.

Step 1

Listening

Understanding the real need before talking price.

Step 2

Pricing

The quote is prepared by the director. Options worked out with you.

Step 3

Construction

A stable site team, a weekly progress review.

Step 4

Handover

Snags cleared, minutes signed, records filed. We finish cleanly.

This page sets out exactly how we work. There is a simple reason for it: a client needs to know who prices the job, who will actually be on site, how quantities are tracked, and what they will be left with at the end. Here are the answers, without the usual filler.

The price is prepared by the company director

There is no sales desk at K-Stone. The drawings, the specification or the scope of works are read by the director, a civil engineering graduate of ESTP Paris, who prepares the price and the options himself. Two direct consequences for you: the technical answer and the price come from the same person, and that person remains your point of contact for the whole duration of the works.

  • One point of contact, from the first call to the last snag cleared
  • Options are offered and discussed, never imposed
  • Your documents and your prices do not leave the office

Supervisors who stay on site

The company brings together around two hundred people, supervisors and site crews, with the office based in Guéliz, Marrakech. On a single operation the headcount has reached one hundred and twenty, at the pyrotechnic plant in Settat. We take on few projects at a time, which lets supervisors travel with the crews and stay put, including on remote sites where a living base is set up.

  • The team that starts the project is the team that finishes it
  • A weekly review with the client until handover
  • Living base and logistics organised for remote sites

The project followed on a 3D model

On structures that allow it, such as the SP1 pumping station in Safi, the project is followed on a digital model. Concrete volumes and steel weight per bar diameter are kept up to date structure by structure. That is what makes it possible to compare planned against actual at any time, to spot a drift before it costs money, and to justify every site record.

  • Quantities kept up to date structure by structure
  • Site records justified, with no argument at the end of the month
  • Gaps between planned and actual visible as soon as they appear

Safety: no claim, no accident reported

To date, no claim and no accident have been reported on K-Stone sites. That is not luck: part of our work happens on sites where mistakes are not an option. A pyrotechnic plant with its safety distances and earth berms. A building inside a fully operational airport, with controlled access and imposed working hours. A stadium in use, with the public nearby. Those constraints shaped the way we organise a site.

  • Sensitive sites: pyrotechnic, airport, premises in use
  • Supervisors present at all times, not visiting
  • Access, hours and phasing agreed with the operator before starting

What you receive at handover

A project is also judged on what is left on paper. We hand over a complete file, like the photographic record file for the Marrakech Grand Stadium, so the structure can be operated and defended over time.

  • As-built drawings
  • Minutes and cleared snag lists
  • Site records and actual quantities
  • Photographic record file where the structure calls for it

View our projects Download the company brochure (PDF, in French)

Contact

Let’s talk about your next structure.

RIVA Building, Guéliz · Marrakech · +212 5 22 24 90 15

Request a quote
Message us on WhatsApp