Marrakech · Morocco · Completed

Marrakech Grand Stadium

External works, 3 training pitches, refurbishment of the secondary stadium, northern bypass road and utilities. 45,000 m² of paving. With SOMAGEC.

Marrakech Grand Stadium — Marrakech · Morocco (1/46)

Marrakech Grand Stadium · Marrakech · Morocco 1 / 46

The constraint

Working inside a stadium that stayed in use, alongside the SOMAGEC consortium, with external works expected for sporting deadlines that do not move.

Our answer

Three training pitches, refurbishment of the secondary stadium, the northern bypass road and the utility networks, coordinated trade by trade.

The outcome

45,000 m² of exposed aggregate concrete paving laid while the site stayed in use, twelve months of works, photographic record file handed over at completion.

Project at a glance

Key figures for Marrakech Grand Stadium
Building worksThree training pitches and refurbishment of the secondary stadium
RoadsNorthern bypass road and external utilities
Paving45,000 m² of exposed aggregate concrete
Duration12 months

External works at the Marrakech Grand Stadium: three training pitches built, the secondary stadium refurbished, the northern bypass road created along with the utility networks.

The exposed aggregate concrete paving covers 45,000 m², laid while the site stayed in use, with a photographic record file handed over at completion.

This project is run the way every project is run at K-Stone Construction: one point of contact, a quote prepared by the company director, a stable site team and a weekly review until handover.

Current status: Completed. For construction details, quantities or comparable references, write to contact@k-stoneconstruction.com or call +212 5 22 24 90 15.

We build this type of structure anywhere in Morocco, including remote sites and sites that stay in operation during the works. Supervisors travel with the crews, quantities and site records are kept up to date project by project, and the handover file is delivered complete: as-built drawings, minutes, snag clearing.

Method

How we run a project.

You speak directly to the person who decides and prices the work. No sales desk between your need and the technical answer.

Step 1

Listening

Understanding the real need before talking price.

Step 2

Pricing

The quote is prepared by the director. Options worked out with you.

Step 3

Construction

A stable site team, a weekly progress review.

Step 4

Handover

Snags cleared, minutes signed, records filed. We finish cleanly.