Safi · Morocco · In progress

SP1 pumping station

Civil engineering works for the desalinated water transfer scheme. Close technical follow-up through to handover. 80,000 m³ of earth moved in 60 days.

SP1 pumping station — Safi · Morocco (1/48)

SP1 pumping station · Safi · Morocco 1 / 48

The constraint

A structure that governs the water supply of Greater Marrakech: 80,000 m³ to excavate without pushing back commissioning, on a site where the civil works must be ready before the hydraulic equipment arrives.

Our answer

Earthworks, structural concrete, waterproofing and external utilities taken as a single package, followed on a 3D model: concrete volumes and steel weight per bar diameter kept up to date structure by structure.

The outcome

80,000 m³ excavated in 60 working days, 80% complete, provisional handover expected in the first quarter of 2026, snags cleared as the work goes on.

Project at a glance

Key figures for SP1 pumping station
PurposeTransferring desalinated water from the Safi plant to Greater Marrakech
ScopeEarthworks, structural concrete, waterproofing, external utilities
Earthworks80,000 m³ in 60 working days
Duration8 months
Progress80% · provisional handover expected in the first quarter of 2026

SP1 is part of the chain that carries desalinated water produced in Safi to Greater Marrakech. K-Stone is delivering the earthworks, the structural concrete, the waterproofing and the external utilities.

The project is followed on a 3D model: concrete quantities and steel weight per bar diameter are kept up to date structure by structure, and snags are cleared as the work goes on.

This project is run the way every project is run at K-Stone Construction: one point of contact, a quote prepared by the company director, a stable site team and a weekly review until handover.

Current status: In progress. For construction details, quantities or comparable references, write to contact@k-stoneconstruction.com or call +212 5 22 24 90 15.

We build this type of structure anywhere in Morocco, including remote sites and sites that stay in operation during the works. Supervisors travel with the crews, quantities and site records are kept up to date project by project, and the handover file is delivered complete: as-built drawings, minutes, snag clearing.

Method

How we run a project.

You speak directly to the person who decides and prices the work. No sales desk between your need and the technical answer.

Step 1

Listening

Understanding the real need before talking price.

Step 2

Pricing

The quote is prepared by the director. Options worked out with you.

Step 3

Construction

A stable site team, a weekly progress review.

Step 4

Handover

Snags cleared, minutes signed, records filed. We finish cleanly.

More projects

Also worth a look

All projects

Contact

A similar structure to build?

RIVA Building, Guéliz · Marrakech · +212 5 22 24 90 15

Request a quote
Message us on WhatsApp