The constraint
A hotel on a remote lakeside site in the Middle Atlas: distant supply lines, crews to accommodate on site, a rainy season to build into the schedule.
Bin El Ouidane · Morocco · Completed / monitored
A hotel built at Bin El Ouidane: structural works and site management.
Bin El Ouidane hotel · Bin El Ouidane · Morocco 1 / 5
A hotel on a remote lakeside site in the Middle Atlas: distant supply lines, crews to accommodate on site, a rainy season to build into the schedule.
Structural works and site management with a living base on site and supervisors present at all times, as on every one of our remote projects.
Built and followed through to delivery, with no break in supply.
Bin El Ouidane hotel · Bin El Ouidane · Morocco. A hotel built at Bin El Ouidane: structural works and site management.
This project is run the way every project is run at K-Stone Construction: one point of contact, a quote prepared by the company director, a stable site team and a weekly review until handover.
Current status: Completed / monitored. For construction details, quantities or comparable references, write to contact@k-stoneconstruction.com or call +212 5 22 24 90 15.
We build this type of structure anywhere in Morocco, including remote sites and sites that stay in operation during the works. Supervisors travel with the crews, quantities and site records are kept up to date project by project, and the handover file is delivered complete: as-built drawings, minutes, snag clearing.
Method
You speak directly to the person who decides and prices the work. No sales desk between your need and the technical answer.
Understanding the real need before talking price.
The quote is prepared by the director. Options worked out with you.
A stable site team, a weekly progress review.
Snags cleared, minutes signed, records filed. We finish cleanly.

Contact
RIVA Building, Guéliz · Marrakech · +212 5 22 24 90 15
Request a quote