Settat · Morocco · Completed

EPC pyrotechnic plant

Pyrotechnic facility at Machraa Ben Abou and Mzoura for EPC Maroc. A 744,600 m² site, 7,700 m² built, 16 months of work.

EPC pyrotechnic plant — Settat · Morocco (1/17)

EPC pyrotechnic plant · Settat · Morocco 1 / 17

The constraint

A pyrotechnic facility: buildings shielded by earth berms, mandatory safety distances between structures, 744,600 m² of bare ground to open up and service.

Our answer

Tracks and platforms opened, 7,700 m² of buildings, 58,000 m² of external works treated with hydraulic binders, up to 120 people supervised on site.

The outcome

The largest site K-Stone has run, delivered in sixteen months, with no claim and no accident reported.

Project at a glance

Key figures for EPC pyrotechnic plant
PurposePyrotechnic facility at Machraa Ben Abou and Mzoura
Site area744,600 m²
Floor area built7,700 m²
External works58,000 m² treated with hydraulic binders
Duration16 months
Workforce120 people

The largest site K-Stone has run: a pyrotechnic facility spread over 744,600 m² at Machraa Ben Abou and Mzoura, in the Settat region.

The buildings, shielded by earth berms, add up to 7,700 m² of floor area. The 58,000 m² of external works were treated with hydraulic binders. Sixteen months of work, with up to 120 people on site.

This project is run the way every project is run at K-Stone Construction: one point of contact, a quote prepared by the company director, a stable site team and a weekly review until handover.

Current status: Completed. For construction details, quantities or comparable references, write to contact@k-stoneconstruction.com or call +212 5 22 24 90 15.

We build this type of structure anywhere in Morocco, including remote sites and sites that stay in operation during the works. Supervisors travel with the crews, quantities and site records are kept up to date project by project, and the handover file is delivered complete: as-built drawings, minutes, snag clearing.

Method

How we run a project.

You speak directly to the person who decides and prices the work. No sales desk between your need and the technical answer.

Step 1

Listening

Understanding the real need before talking price.

Step 2

Pricing

The quote is prepared by the director. Options worked out with you.

Step 3

Construction

A stable site team, a weekly progress review.

Step 4

Handover

Snags cleared, minutes signed, records filed. We finish cleanly.